Reasons for unqualified discharge of crusher
2022-08-03
The crusher is mainly used for fine crushing operation with ore particle size less than 80mm. It has the advantages of small volume, large crushing ratio, low noise, simple structure and convenient maintenance. The particle size of the crushed material is uniform, the over crushing rate is low, and the particle size of the finished product is 0.5-40mm. For the production process of the crusher, whether it is the occurrence of faults, the analysis of the reasons for the decline in output, or the solution to the unreasonable phenomenon of discharging, are important operations in production. These operations are to ensure the efficiency of production. Different phenomena are caused by different reasons. Here are the following four points to introduce the reasons for the phenomenon of unqualified discharging.
1. Crushing ratio
Crushing ratio refers to the ratio of the particle size of the imported material and the crushed finished product. The larger the ratio is, the larger the crushing ratio is, and vice versa. For the production process of the crusher, if the crushing ratio is large, the needle and sheet content will increase. Therefore, in production, the adjustment of the crushing ratio is an important measure to ensure the discharge. Of course, too small crushing ratio is not enough, which will reduce the output of the whole system and increase the internal circulation volume, The wear of crusher increases, so the selection of crushing ratio needs to be appropriate.
2. Feed particle size
For crushers, different types or different models can process different feed sizes. If the feed size is not appropriate, it will also cause the phenomenon that the discharge quality is not up to standard.
3. Open and closed cycle
In the production of crusher, circulation is divided into road circulation and closed-circuit circulation. The former is called screening before crushing, and the latter is called crushing before screening. Screening before crushing refers to screening the crushed materials through the finished product screen first, and then entering the secondary crushing inlet for crushing. In this way, the output of finished materials increases, and the needle and flake content also increases. Crushing before screening refers to entering all the crushed materials into the secondary crusher inlet, The whole system is a closed system, which can select open circuit or closed circuit according to the production demand.
The above is all about the reasons why the crusher discharge does not meet the standard. Have you understood it? Hope to help you!